| They came one day and prepared the deck for the cement. |
| We had them pour such a large deck that they had to do it in two days. |
| The last step was to put a type of pool concrete in the bottom and sides of the pool to make it smooth before putting the liner in. |
![]() |
| It took about two days to fill with water. |
| We are so excited to spend a lot of summer days just sitting and enjoying the pool! |


No comments:
Post a Comment